The
process of self-installing a putting green involves a carefully
planned series of steps. The skills that are required
to install a green increase in difficulty as the size of the
putting green increases.
Smaller putting greens that are under 500 square
feet require less precision in preparation and turf installation.
Larger greens require more planning and precision, and can
likely be too much of a headache for the average consumer.
We strongly recommend that you consider having
putting greens over 500 square feet installed by a PGD CHICAGO certified installer. If you decide to self install,
we have included the essential steps that you will need to
take to install a basic putting green.
When you purchase a PGD CHICAGO putting
green, you will receive an installation manual that details
each step. This manual is easy to use and understand. In addition,
our customer support line is open Monday through Friday 9-6
EST. (Or any other prearranged time.)
- Planning a Putting green is the first and
most crucial step of the process. See planning for details.
- Design and layout is necessary to ensure
proper placement before the work begins.
- Clear the area of vegetation and other debris
when preparing the area for your putting green.
- Install a ground stabilization tarp to insure
a solid, long lasting foundation.
- Setting the cup sleeves is the first step
in installing the base.
- The most labor intensive step in the installation
process is the aggregate or concrete base installation.
This involves a series of steps to work and re-work the
base until perfection is attained.
- Next is the placement of the turf. This step
most likely will also involve seaming of two or more sections.
- Cutting, trimming and permanent setting of
the cups will require a delicate touch and care.
- The next step is trimming and shaping the
outer edges of the putting green. Also, at this stage a
fringe can be installed if desired.
- The last step in the basic process, if applicable,
is the application of fill material, or top dressing.
As you can see there are a number of steps involved
in even a basic green installation. A putting green of 500
square feet or less can typically be installed by two adults
in a 1.5 to 2.5 day time frame.
|